Steep backyards, downspouts at the foundation and front beds that lost their shape all show up in Chesterfield yards. Our local crew brings 25+ years of hands-on experience, and we’ve built retaining walls, drainage and new landscaping here. So we plan the walls, the water and the planting together, not one at a time.
Request a project consultation & estimate.
Neighbors trust our work
Combined experience & expertise
Contractor & paver expertise
We stand behind the build
Chesterfield, MO - Completed Project
A steep, overgrown hillside took up a large part of this Chesterfield backyard, and it was hard to reach or maintain. In two working days, we cleared it and built tiered segmental block walls, with steps between the levels and new mulched planting beds behind them.
2 Day Build
Segmental wall block with matching caps
Drainage aggregate behind the walls
Every service below has a finished Chesterfield job behind it, from tiered walls on a backyard hill to buried downspout lines along a foundation
A steep backyard can feel like lost space. It’s hard to walk, hard to mow and hard to plant, so most people just leave it alone. But one tall wall isn’t the only way to take it back.
That’s why we often build short tiers instead. Each segmental block wall follows the slope, steps connect the levels, and every tier holds its own planting bed. In the front yard, we let you pick the wall stone and edge the beds and driveway around it. Drainage goes in behind every wall we build.
If water shows up in your basement after a storm, look at your downspouts first. When they let roof water out right at the foundation, that water has nowhere to go but down along your walls.
So we tie the downspouts into buried PVC pipe and add a French drain along the house, and the water leaves underground. It fits even in a tight strip next to the driveway. Then we finish the strip with decorative rock and landscape lights, so you never see the pipe.
Front beds lose their shape over time. The edges blur into the lawn, plants fill in unevenly, and the yard starts to look like separate patches instead of one design. New plants in the same loose outlines won’t fix that.
On a front yard wall job, we built the wall and edging first and planted last, so nothing got dug up twice. About 50 plants went in, including ornamental grasses, dwarf crape myrtles, trees, shrubs and perennials.
Many Chesterfield yards come with a steep backyard or a long driveway, and the trouble spots are often the smallest ones, like a narrow strip by the foundation. We plan around all three.
A hill you never walk on doesn’t have to be flattened. Short tiers with steps between them turn one steep slope into levels you can reach, plant and keep up with, one bed at a time.
Downspout water often lands in the tightest spot on the lot, right between the house and the driveway. A buried drain line can still fit there, and a rock bed on top makes the strip look finished again.
On a big yard, clean edges do more than new plants. Once the beds and the driveway have clear lines, the planting looks planned instead of scattered, so the edges go in first and the plants go in last.
Feedback from homeowners we’ve worked with in Chesterfield and across St. Louis County.
5-star Google rating
In Chesterfield, we’ve built tiered segmental block walls with steps on a backyard hillside, and a front retaining wall near the house with stone the homeowners picked. We also build walls as part of larger landscape jobs. The layout depends on the slope, drainage, access and how you’ll use the space.
We plan drainage as part of every wall, the water’s path, drainage aggregate behind the wall, grading and where the water comes out. Bigger water problems may need underground drainage. For drainage solutions, reach out to us
A tiered wall makes sense when a steep slope works better as several short levels than behind one tall wall. On one Chesterfield hillside, the tiers gave the homeowners steps between the levels and a planting bed behind each wall, and the hill kept its natural slope. See the project details
First, we give the water a path underground, starting at the downspouts. At one Chesterfield home, we dug along the foundation, put in a French drain and tied the downspouts into buried PVC pipe that carries the water away from the house. Then we covered the strip with decorative rock.