Installing Drain Boxes and a Majestic Paver Patio in Wildwood
The homeowners at this property wanted a bigger patio, and rainwater kept pooling in the exact spot where it needed to grow. We handled both in one plan. Drain boxes went in near the patio first, then we expanded the patio with County Materials Majestic pavers and a charcoal border in three working days.
A Small Patio, and Standing Water Right Where It Needed to Grow
The existing patio behind this Wildwood home was too small for how the family wanted to use the backyard: room for outdoor furniture and family gatherings, plus a hot tub they plan to add later. The yard had space to expand, but rainwater collected where the bigger patio would go and stood there during heavy rain.
Why the Drainage Had to Come Before the Pavers
The patio and the standing water were in the same part of this Wildwood backyard, so we planned them as one job. Pave over a spot where water collects and the water stays, at the patio’s edge or under it. Before digging, we looked at how water was moving and where drainage correction had to catch it.
Drain Boxes First, Then Majestic Pavers With a Charcoal Border
The drainage went in first. We set drain boxes near the patio to catch the runoff that had been pooling in the yard and send it away from the finished patio. A drain box is a catch basin set in the ground that collects surface water. With that in place, we excavated and prepared the new patio footprint.
A compacted aggregate base, crushed stone packed tight, went down under the pavers. The homeowners chose County Materials Majestic pavers with a charcoal border that marks the edge of the expanded patio. We finished the paver patio installation with polymeric sand in the joints, which sets up once it’s wet down, and a final compaction pass.
The completed project included:
- Drain boxes near the patio to collect runoff
- Drainage correction where water stood during heavy rain
- Excavation and preparation of the new patio footprint
- Compacted aggregate base under the pavers
- County Materials Majestic pavers with a charcoal border
- Polymeric sand in the joints and a final compaction pass
- Completed in three working days
Room for Furniture, Gatherings and a Future Hot Tub, Without the Standing Water
This Wildwood backyard now has a much bigger patio, with room for the outdoor furniture and family gatherings, and space saved for the hot tub the homeowners plan to add. Because the drain boxes went in before the pavers, the expanded patio sits where the water used to be, not next to it.
The standing water is gone from the spot that used to hold it, and the drain boxes now catch that runoff and send it away from the pavers. In their review, the homeowners said “the drainage issue is completely resolved.” The whole patio expansion took three working days and was finished in May 2026.
How to Check a Future Patio Spot for Standing Water
Before you add on to a patio, walk the spot after the next heavy rain. If water is still standing once the rain stops, or the ground stays soft for days, plan the drainage with the patio, not after it. Fixing water under finished pavers means pulling them up. We build patios and fix drainage in Wildwood and nearby towns.